gabegorelik gabegorelik
  • 22-10-2021
  • Mathematics
contestada

working simustainle 4 fudge machines finish a big job in 32 hours how long would it take if it had 4 times as more machines

Respuesta :

helloitzme1542 helloitzme1542
  • 22-10-2021

Answer:

8 hours

Explanation:

32÷4=8

It takes 4 machines to do something in 32 hours. If you had 4 times more machines it would be 4 times faster.

Answer Link

Otras preguntas

convert 32 cm to in STEP BY STEP
FOR 100 POINTS how do I do 11 13 15 and 17
A factory's production is modeled by function f(x), where f(x) is the number of parts produced per hour and x is the number of people working during production.
Someone help plz!! It would be a big help :) tysm
Makayla is taking a math course and is working with the perimeter of rectangles. She knows the perimeter and length of her rectangle but wants to solve for the
Through (-1,5) , perp to y =1/9x+2 write the slope intercept form for the equation
Can anyone help me solve these math problems? If you don’t mind, please tell me how you got the positive angle and negative angle.
What is the effect of temperature on the solubility of : A) solids in liquids B) gases in liquids
Please answer this correctly
At Print All copying, a new copying machine can produce five more than twice the number of copies per hour of the old copy machine. If the new machine produces