dogatheart4ever
dogatheart4ever dogatheart4ever
  • 21-06-2021
  • Mathematics
contestada

eight workers can clear twenty acres of a field in three days. how many workers are needed to clear fifty acres in five days?

Respuesta :

aanttxt aanttxt
  • 22-06-2021
12 , hope this helps!!!
Answer Link

Otras preguntas

The acknowledgment that Americans have other rights besides those listed in the Bill of Rights: 1. Seventh amendment 2. Eight amendment 3. Ninth amendment 4
1/3x+y=4 solve the equation for y
Giotto used foreshortening in order to?
A factory's production is modeled by function f(x), where f(x) is the number of parts produced per hour and x is the number of people working during production.
How much heat is required to raise the temperature of 670g of water from 25.7"C to 66,0°C? The specific heat of H,0 is 4.1841/gC)
Trish's bounces the ball at 0.76 for in front of her feet. The path of the ball from the time it hits the ground until it it lands on the floor is represented b
I need answer fast please
the figure formed by intersection of a solid with a plane parallel to the base of the solid is congruent to the base if the solid is a A. frustum of a cone B.
What is the main difference between a struct and a class?
Who’s responsibility is it to ensure that our oceans are clean? What are the reasons?