bezakarelle bezakarelle
  • 24-06-2020
  • Mathematics
contestada

if 8 people can pick the apples from the trees in 6 days, how long will it take 12 people

Respuesta :

mhanifa
mhanifa mhanifa
  • 24-06-2020

Answer:

4 days

Step-by-step explanation:

8 people can do the job in 6 days, job is this case is picking apples.

  • The amount of the job (apples) is same and the only variable is number of people which changes the time accordingly.  

1 person can do same job for 6*8= 48 days

12 people can do same for 48/12= 4 days

Answer Link

Otras preguntas

I need the answer asap!!!
What is 6 divided by 66 and show how to solve it
the position of the united states toward latin America in the 1800s was secifically based on
A 6,000 liter tank of water is at 0 oC. It must be heated to 20 oC. How many calories are required to do so?
No plant can survive without water Absolute or Qualified???
Read the sentence. Andrew told me that his uncle was a World War II veteran when he was in high school. Which revision clarifies the confusing pronoun in this
What is the average velocity of a car that travels 450 km north in 9.0 hours?
As biodiversity increases in an ecosystem, the ecosystem?
△QRS is rotated about point P to △Q′R′S′ . Which statements are true about the pre-image and image? Select each correct answer. a. The shape of the pre-image a
4. Explain what gives you the right to declare your independence.