If Tina cuts a lawn by herself, she can finish in 5 hours. If bill cuts the same lawn by himself it takes him two hours longer than Tina. How long will it take them both working together?

Respuesta :

celeste66 celeste66
  • 25-03-2019
Tina can finish in 5 hours
Bill takes two hours longer than Tina.
5+2=7
Bill takes 7 hours to cut the lawn.
7+5=12
It takes both of them working together 12 hours. Hope this helped!
Answer Link

Otras preguntas

Triangle 1 has vertices at (A,B), (C,D), and (E,F). Triangle 2 has vertices at (A+1,B+3), (C+1,D+3), and (E+1,F+3). What can you conclude about triangle 2? A.
A worm is decomposing plant matter and putting it into the soil. What type of nutrient consumption does that worm exhibit
Plz help ASAP which choice is it and why ?
Can someone give an explanation
Please help me I don’t know
Which theory posited that when given a choice between two or more options, humans will choose the one that is most likely to help them achieve their particular
Can someone give an explanation
Muchos países ya ________ (empezar-2 palabras) a vender carros eléctricos.
x+a=c solve for x what does x equal​
On a coordinate plane, vertex A for triangle ABC is located at (6,4). Triangle ABC is dilated by a scale factor of 0.5 with the center of dilation at the origin